First Christian Church Yukon selects kerr 3 design group for sanctuary renovation

Posted by Jim Quade on 01/13/2016

kerr 3 design group along with Red Sky Constructors was selected by First Christian Church Yukon for their sanctuary renovation. kerr 3 handled the overall design of the renovation while Red Sky was responsible for the construction management of the project. Work is scheduled to be completed February, 2016.